ABC         2007 Safety Award Winner...see company news

PO Box 305
Avon, MA 02322
Office: 508.897.0079
Fax: 508.897.0622
info @seluttazi.com
Project Gallery Employment Opportunities About SE Luttazi

our equipment

Featured Projects Company News Our History

SITE CONSTRUCTION

Utility Installation

Septic Systems

Wetlands Crossing

Earth Support

Spreading playfie

The new Shipley Athletic Center at the Dana Hall School in Wellesley MA., will house an Olympic size swimming pool, squash and racquetball courts, full size gymnasium and a weight and fitness center. 

Construction manager Shawmut Design and Construction awarded the site work to SEL in March 2004. Our crews quickly began the task of excavating 15,000 cy of soils and 7,500 cy of ledge. Due to the restraints of the nearby school and horse boarding facility, our blasting subcontractor carefully formulated a blast plan that ensured their operations would continue without interruption. With blasting completed in just 3 weeks, our excavation crew led by Rick Donoghue excavated down over 20 feet below grade for the footings and swimming pool. Vaughn Barsamian and Kevin Patten operated our 400 Komatsu and 290 Volvo excavators while a fleet of 10 trucks hauled surplus materials from the site. Fernando Ortiz with the Cat 960 Loader kept a steady supply of crushed stone coming to laborers Mike Santry and Joe Cantelli as they graded for the eight foot wide concrete footings. The pipe crew led by Skip Martin and Mark Allison along with Henry Oliviera and Al Buckless installed a 2100 lf drainage system and 1700 lf of water main. Cesar Pereira and his crew of Mario Sousa, Mike Borges, Roger Johnson and Ken McGill installed over 12,500 cy of compacted structural fill under the new gymnasium floor slab. 

This project will be completed during the summer of 2005 when our crews will install curbing and sidewalks, landscape and final pave.

S&F setting formwork for the G.2 Line footing
Overview of excavation and blasting operation
Blasting mat removal
Drilling of ledge for blasting operation
Utility trench excavation for new sewer line
Construction entry off Grove Street
View of detention basin with soil separator
Soil separator and layer of crushed stone Topsoil stripped and stockpiled at temporary parking area Demolition preparation along Mudd Gymnasium base

   For more information email - info@seluttazi.com

 

 

© Copyright 2005 S.E. Luttazi & Sons, Inc.      Associated Builders & Contractors, Inc.   Builders Association of Greater Boston